I'm reading Friday's Citizen and I get to the sports section and it almost knocked me off my chair.
Here's why: the picture in colour is: 1) a big dump truck; 2) a hoe; and 3) a bucket machine and a bobcat and three operators probably, and three city supervisors loading ice to haul away from CN Centre.
I'm wondering how much this is costing.
Why not wait and let the ice melt. I presume the surface has a drain, so let the law of physics do the work. I'm just a dumb welder so I'm sure there are smarter people at city hall to figure this out.
Have a smart day.
Warner Bliskis
Prince George